{"id":10042,"date":"2026-09-30T20:50:53","date_gmt":"2026-09-30T17:50:53","guid":{"rendered":"https:\/\/100re.org.ua\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/"},"modified":"2026-09-30T21:12:25","modified_gmt":"2026-09-30T18:12:25","slug":"solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/","title":{"rendered":"Solar Power at the Factory Gate: Ukraine&#8217;s Path Through the EU Carbon Border Levy"},"content":{"rendered":"<p>Ukraine&#8217;s solar industry association is urging exporters in carbon-intensive sectors to treat on-site renewable energy not merely as a cost-cutting measure but as a tool for managing liabilities under the EU&#8217;s Carbon Border Adjustment Mechanism. ASEU board chair Vladislav Sokolovsky made the case at a Dialogue Hub event, explaining that CBAM explicitly accounts for the electricity component in industries such as cement and fertiliser production.<\/p>\n<p>The mechanism converts a product&#8217;s carbon intensity into a direct line item in export economics. CBAM obligations already apply to deliveries made this year, even though sales of the corresponding European certificates are not scheduled to begin until 2027. ASEU warns that the resulting costs may ultimately be borne by Ukrainian sellers through contract terms, making early preparation commercially significant.<\/p>\n<p>Installing solar capacity directly on a plant&#8217;s premises creates a verifiable technical link between clean generation and production, Sokolovsky said. A physical corporate power purchase agreement may also enable a lower effective emissions factor \u2014 but only when backed by rigorous hourly consumption tracking and independent verification. &#8220;The main thing is to confirm low emissions of a specific delivery under EU rules,&#8221; he noted.<\/p>\n<p>Plants pairing solar with battery storage \u2014 now roughly 80 percent of new installations \u2014 face an additional complication: distinguishing self-generated electrons stored in the battery from volumes drawn from the wider grid. Separate technical meters may be required, along with clear origin-confirmation rules, to satisfy European scrutiny.<\/p>\n<p>Ukraine&#8217;s domestic guarantees of origin are not equivalent to CBAM certificates, but ASEU sees their potential EU recognition as one element of a broader decarbonisation strategy. The association is calling for pilot export deliveries to test how these approaches hold up in practice.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/aseu.org.ua\/aseu-doluchylasya-do-dialogue-hub-ukrayina-ta-cbam-sonyachna-energetyka-mozhe-dopomogty-ukrayinskym-eksporteram-zmenshyty-vytraty-na-cbam\/\" target=\"_blank\" rel=\"noopener\">\u0410\u0421\u0415\u0423<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ukraine&#8217;s solar industry association is urging exporters in carbon-intensive sectors to treat on-site renewable energy not merely as a cost-cutting measure but as a tool for managing liabilities under the EU&#8217;s Carbon Border Adjustment Mechanism. ASEU board chair Vladislav Sokolovsky made the case at a Dialogue Hub event, explaining that CBAM explicitly accounts for the [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":10021,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-10042","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Solar Power at the Factory Gate: Ukraine&#039;s Path Through the EU Carbon Border Levy - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar Power at the Factory Gate: Ukraine&#039;s Path Through the EU Carbon Border Levy - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"Ukraine&#8217;s solar industry association is urging exporters in carbon-intensive sectors to treat on-site renewable energy not merely as a cost-cutting measure but as a tool for managing liabilities under the EU&#8217;s Carbon Border Adjustment Mechanism. ASEU board chair Vladislav Sokolovsky made the case at a Dialogue Hub event, explaining that CBAM explicitly accounts for the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-30T17:50:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-30T18:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Solar Power at the Factory Gate: Ukraine&#8217;s Path Through the EU Carbon Border Levy\",\"datePublished\":\"2026-09-30T17:50:53+00:00\",\"dateModified\":\"2026-09-30T18:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\"},\"wordCount\":291,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\",\"url\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\",\"name\":\"Solar Power at the Factory Gate: Ukraine's Path Through the EU Carbon Border Levy - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg\",\"datePublished\":\"2026-09-30T17:50:53+00:00\",\"dateModified\":\"2026-09-30T18:12:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar Power at the Factory Gate: Ukraine&#8217;s Path Through the EU Carbon Border Levy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Solar Power at the Factory Gate: Ukraine's Path Through the EU Carbon Border Levy - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/","og_locale":"en_US","og_type":"article","og_title":"Solar Power at the Factory Gate: Ukraine's Path Through the EU Carbon Border Levy - Global 100 RE UKRAINE","og_description":"Ukraine&#8217;s solar industry association is urging exporters in carbon-intensive sectors to treat on-site renewable energy not merely as a cost-cutting measure but as a tool for managing liabilities under the EU&#8217;s Carbon Border Adjustment Mechanism. ASEU board chair Vladislav Sokolovsky made the case at a Dialogue Hub event, explaining that CBAM explicitly accounts for the [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-09-30T17:50:53+00:00","article_modified_time":"2026-09-30T18:12:25+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Solar Power at the Factory Gate: Ukraine&#8217;s Path Through the EU Carbon Border Levy","datePublished":"2026-09-30T17:50:53+00:00","dateModified":"2026-09-30T18:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/"},"wordCount":291,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/","url":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/","name":"Solar Power at the Factory Gate: Ukraine's Path Through the EU Carbon Border Levy - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg","datePublished":"2026-09-30T17:50:53+00:00","dateModified":"2026-09-30T18:12:25+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-korporatyvni-ses-mozhut-dopomohty-ukrainskym-eksporteram-pom.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/solar-power-at-the-factory-gate-ukraines-path-through-the-eu-carbon-bo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Solar Power at the Factory Gate: Ukraine&#8217;s Path Through the EU Carbon Border Levy"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=10042"}],"version-history":[{"count":0,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10042\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/10021"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=10042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=10042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=10042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}