{"id":10297,"date":"2026-10-07T09:53:04","date_gmt":"2026-10-07T06:53:04","guid":{"rendered":"https:\/\/100re.org.ua\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/"},"modified":"2026-10-07T10:39:48","modified_gmt":"2026-10-07T07:39:48","slug":"ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/","title":{"rendered":"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans"},"content":{"rendered":"<p>The United States now has 60.4 gigawatts of new gas-fired power capacity in the planning pipeline for completion by 2030 \u2014 a 44 percent increase from the 41.8 GW anticipated just last December, according to an Environment America Research &#038; Policy Center report.<\/p>\n<p>To grasp the scale: those planned gas additions would exceed the total generation capacity of every US state except Texas, California, and Florida. Texas alone accounts for roughly a third of the projected new gas capacity nationally.<\/p>\n<figure class=\"wp-block-image size-large\" style=\"margin:1.5em 0 2.4em;\"><img decoding=\"async\" src=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/chart-1-en-2026-10-07-1.png\" alt=\"Growth in gas generation construction plans. Data: Environment America \/ Frontier Group based on EIA filings\" style=\"max-width:100%;height:auto;\" \/><figcaption style=\"display:block;font-size:13px;font-weight:400;font-style:italic;color:#8a8f86;text-align:center;line-height:1.45;margin-top:8px;\">Growth in gas generation construction plans. Data: Environment America \/ Frontier Group based on EIA filings<\/figcaption><\/figure>\n<p>The expansion is being driven by electricity demand from artificial intelligence data centers, which has pulled gas generation back into utility planning after years on the sidelines. Analysts warn this trajectory puts the US strategy for a cleaner grid at risk \u2014 especially since new wind project volumes fell by 33.9 percent over the same period. Compared with early 2023, planned gas interconnections have nearly tripled.<\/p>\n<p>All 60.4 GW represent applications submitted to the federal Energy Information Administration. Whether the figure actually reshapes the grid depends on how many projects obtain all required approvals and licences and are ultimately built before 2030.<\/p>\n<p>The public-health consequences of following through could be severe. Modelling cited in the report suggests a rapid data-center expansion scenario could cause nearly 1,300 premature deaths in 2028 through air pollution \u2014 generated by fossil fuel power stations, dedicated gas turbines at facility sites, and diesel backup generators kept on standby. New plants coming online now will operate for decades, and their presence will delay the closure of existing coal-fired units.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/electrek.co\/2026\/10\/06\/us-gas-plant-plans-jump-44-in-just-8-months-heres-why\/\" target=\"_blank\" rel=\"noopener\">Electrek<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The United States now has 60.4 gigawatts of new gas-fired power capacity in the planning pipeline for completion by 2030 \u2014 a 44 percent increase from the 41.8 GW anticipated just last December, according to an Environment America Research &#038; Policy Center report. To grasp the scale: those planned gas additions would exceed the total [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":10263,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-10297","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"The United States now has 60.4 gigawatts of new gas-fired power capacity in the planning pipeline for completion by 2030 \u2014 a 44 percent increase from the 41.8 GW anticipated just last December, according to an Environment America Research &#038; Policy Center report. To grasp the scale: those planned gas additions would exceed the total [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-07T06:53:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-07T07:39:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans\",\"datePublished\":\"2026-10-07T06:53:04+00:00\",\"dateModified\":\"2026-10-07T07:39:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\"},\"wordCount\":269,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\",\"url\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\",\"name\":\"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg\",\"datePublished\":\"2026-10-07T06:53:04+00:00\",\"dateModified\":\"2026-10-07T07:39:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/","og_locale":"en_US","og_type":"article","og_title":"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans - Global 100 RE UKRAINE","og_description":"The United States now has 60.4 gigawatts of new gas-fired power capacity in the planning pipeline for completion by 2030 \u2014 a 44 percent increase from the 41.8 GW anticipated just last December, according to an Environment America Research &#038; Policy Center report. To grasp the scale: those planned gas additions would exceed the total [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-10-07T06:53:04+00:00","article_modified_time":"2026-10-07T07:39:48+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans","datePublished":"2026-10-07T06:53:04+00:00","dateModified":"2026-10-07T07:39:48+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/"},"wordCount":269,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/","url":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/","name":"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg","datePublished":"2026-10-07T06:53:04+00:00","dateModified":"2026-10-07T07:39:48+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-plany-budivnytstva-novykh-hazovykh-elektrostantsii-u-ssha.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/ai-data-center-boom-drives-us-gas-power-pipeline-to-record-60-gw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"US Gas Power Pipeline Swells to 60 GW as AI Demand Reshapes Grid Plans"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=10297"}],"version-history":[{"count":1,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10297\/revisions"}],"predecessor-version":[{"id":10307,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10297\/revisions\/10307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/10263"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=10297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=10297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=10297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}