{"id":10979,"date":"2026-10-21T22:32:51","date_gmt":"2026-10-21T19:32:51","guid":{"rendered":"https:\/\/100re.org.ua\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/"},"modified":"2026-10-21T23:22:22","modified_gmt":"2026-10-21T20:22:22","slug":"italy-clears-17-gw-of-battery-storage-in-latest-permit-round","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/","title":{"rendered":"Italy&#8217;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW"},"content":{"rendered":"<p>Rome&#8217;s national environment and energy authority \u2014 MASE \u2014 has signed off on eight unified construction permits covering more than 1.7 gigawatts of battery energy storage systems. Combined with 954 MW authorized in early October, the country&#8217;s total approved battery capacity for the month now approaches 2.7 GW.<\/p>\n<p>Four of the eight newly permitted projects are concentrated in the southern region of Puglia, together accounting for roughly 1.3 GW. The standout development is a 1,000 MW electrochemical facility in Brindisi \u2014 cleared under decree 298\/2026 \u2014 comprising 460 BESS units with a planned twelve-month construction schedule. Three smaller Puglia projects also received approval: Grottaglie Solar BESS (95.76 MW in Grottaglie, Taranto province, decree 297\/2026, with a projected 31-month construction period), Greenvolt (99.9 MW in Copertino), and ACL Energy (116 MW near Bari).<\/p>\n<p>The remaining permits were distributed across Campania, Lazio, and Sardinia. Energy Total Capital&#8217;s subsidiary obtained clearance for a 51 MW facility in Santa Maria Capua Vetere, Campania (decree 299\/2026). Starlight Energy&#8217;s NPD Italia II secured 70 MW in Civitavecchia near Rome (decree 300\/2026), with a 13-month construction period. In Sardinia, BayWa r.e.&#8217;s local unit Viola Rinnovabili won a permit for 55 MW across the communes of Borore and Macomer (decree 302\/2026), while a separate island project adds another 250 MW to the national tally.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/www.ess-news.com\/2026\/10\/21\/italy-authorizes-1-gw-bess-project-in-puglia\/\" target=\"_blank\" rel=\"noopener\">ESS News (pv magazine)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rome&#8217;s national environment and energy authority \u2014 MASE \u2014 has signed off on eight unified construction permits covering more than 1.7 gigawatts of battery energy storage systems. Combined with 954 MW authorized in early October, the country&#8217;s total approved battery capacity for the month now approaches 2.7 GW. Four of the eight newly permitted projects [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":10955,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-10979","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Italy&#039;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Italy&#039;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"Rome&#8217;s national environment and energy authority \u2014 MASE \u2014 has signed off on eight unified construction permits covering more than 1.7 gigawatts of battery energy storage systems. Combined with 954 MW authorized in early October, the country&#8217;s total approved battery capacity for the month now approaches 2.7 GW. Four of the eight newly permitted projects [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T19:32:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T20:22:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Italy&#8217;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW\",\"datePublished\":\"2026-10-21T19:32:51+00:00\",\"dateModified\":\"2026-10-21T20:22:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\"},\"wordCount\":212,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\",\"url\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\",\"name\":\"Italy's October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg\",\"datePublished\":\"2026-10-21T19:32:51+00:00\",\"dateModified\":\"2026-10-21T20:22:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Italy&#8217;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Italy's October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/","og_locale":"en_US","og_type":"article","og_title":"Italy's October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW - Global 100 RE UKRAINE","og_description":"Rome&#8217;s national environment and energy authority \u2014 MASE \u2014 has signed off on eight unified construction permits covering more than 1.7 gigawatts of battery energy storage systems. Combined with 954 MW authorized in early October, the country&#8217;s total approved battery capacity for the month now approaches 2.7 GW. Four of the eight newly permitted projects [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-10-21T19:32:51+00:00","article_modified_time":"2026-10-21T20:22:22+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Italy&#8217;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW","datePublished":"2026-10-21T19:32:51+00:00","dateModified":"2026-10-21T20:22:22+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/"},"wordCount":212,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/","url":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/","name":"Italy's October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg","datePublished":"2026-10-21T19:32:51+00:00","dateModified":"2026-10-21T20:22:22+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/10\/cover-uriad-italii-pohodyv-ponad-1-7-hvt.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/italy-clears-17-gw-of-battery-storage-in-latest-permit-round\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Italy&#8217;s October Permit Wave Brings Battery Storage Approvals Close to 2.7 GW"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=10979"}],"version-history":[{"count":1,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10979\/revisions"}],"predecessor-version":[{"id":10985,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/10979\/revisions\/10985"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/10955"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=10979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=10979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=10979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}