{"id":11838,"date":"2026-11-05T09:07:44","date_gmt":"2026-11-05T07:07:44","guid":{"rendered":"https:\/\/100re.org.ua\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/"},"modified":"2026-11-05T09:07:44","modified_gmt":"2026-11-05T07:07:44","slug":"odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/","title":{"rendered":"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large"},"content":{"rendered":"<p>The city of Odesa is considering a new combined heat and power plant fired by refuse-derived fuel \u2014 RDF and SRF \u2014 produced from sorted municipal waste, with a preliminary price tag of 4.5 billion hryvnias. A waste-sorting facility is envisaged near the future plant to supply raw material. No construction timeline has been set.<\/p>\n<p>The proposal sits inside a broader municipal energy-efficiency programme running from 2022 to 2029, with an overall budget of nearly 33 billion hryvnias. Roughly 79 percent of that programme&#8217;s total funding is expected to come from external investment and loans rather than city coffers \u2014 a gap that has yet to be filled.<\/p>\n<p>Experts see promise in the concept. Hennadiy Ryabtsev, chief researcher at the National Institute for Strategic Studies, said the plant&#8217;s economic feasibility would hinge on the volume and quality of fuel available, the emissions-control system, the cost of preparing raw materials, and compliance with environmental standards.<\/p>\n<p>Energy and utilities expert Yurii Zvolendovskyi identified the existing Odesa thermal-station site \u2014 covering 24 hectares, with portions currently idle \u2014 as a rational location. The site already has rail links, gas-network connections, and heat-distribution mains in place. Analysts broadly agree that such a facility could reduce the city&#8217;s reliance on natural gas and help address part of its household-waste challenge, though the project&#8217;s path from concept to operation remains unclear.<\/p>\n<p>The information was reported by Suspilne and cited by EkoPolitika.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/ecopolitic.com.ua\/ua\/news\/v-odesi-zbudujut-tec-yaka-pracjuvatime-na-vidhodah\/\" target=\"_blank\" rel=\"noopener\">\u0415\u043a\u043e\u041f\u043e\u043b\u0456\u0442\u0438\u043a\u0430<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The city of Odesa is considering a new combined heat and power plant fired by refuse-derived fuel \u2014 RDF and SRF \u2014 produced from sorted municipal waste, with a preliminary price tag of 4.5 billion hryvnias. A waste-sorting facility is envisaged near the future plant to supply raw material. No construction timeline has been set. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11822,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-11838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"The city of Odesa is considering a new combined heat and power plant fired by refuse-derived fuel \u2014 RDF and SRF \u2014 produced from sorted municipal waste, with a preliminary price tag of 4.5 billion hryvnias. A waste-sorting facility is envisaged near the future plant to supply raw material. No construction timeline has been set. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-05T07:07:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large\",\"datePublished\":\"2026-11-05T07:07:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\"},\"wordCount\":238,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\",\"url\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\",\"name\":\"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg\",\"datePublished\":\"2026-11-05T07:07:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/","og_locale":"en_US","og_type":"article","og_title":"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large - Global 100 RE UKRAINE","og_description":"The city of Odesa is considering a new combined heat and power plant fired by refuse-derived fuel \u2014 RDF and SRF \u2014 produced from sorted municipal waste, with a preliminary price tag of 4.5 billion hryvnias. A waste-sorting facility is envisaged near the future plant to supply raw material. No construction timeline has been set. [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-11-05T07:07:44+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large","datePublished":"2026-11-05T07:07:44+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/"},"wordCount":238,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/","url":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/","name":"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg","datePublished":"2026-11-05T07:07:44+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-odesa-planuie-sporudyty-tets-na-palyvi-z.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/odesa-eyes-waste-to-energy-plant-at-45-billion-hryvnias-but-funding-ga\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Odesa Eyes Waste-to-Energy Plant at 4.5 Billion Hryvnias, but Funding Gap Looms Large"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/11838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=11838"}],"version-history":[{"count":0,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/11838\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/11822"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=11838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=11838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=11838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}