{"id":12698,"date":"2026-11-27T07:57:11","date_gmt":"2026-11-27T05:57:11","guid":{"rendered":"https:\/\/100re.org.ua\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/"},"modified":"2026-11-27T07:57:11","modified_gmt":"2026-11-27T05:57:11","slug":"estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/","title":{"rendered":"Estonia Adds Baltic&#8217;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal"},"content":{"rendered":"<p>Estonia has expanded its grid-balancing capacity with a new battery storage system built alongside an existing solar farm near Lihula, creating what its backers describe as the most powerful hybrid renewable complex in the Baltic region.<\/p>\n<p>Estonian energy company Evecon and French investment manager Mirova invested \u20ac110 million in adding a 55 MW\/250 MWh battery system to the 77.5 MW solar farm already operating at the site. The solar installation was completed in October 2024; construction of the battery began in January 2026. Tallinn-based WiSo Engineering, which had previously delivered the Kirikm\u00e4e solar station, served as general contractor. The system is technically ready, with final grid-connection and market-integration tests still under way.<\/p>\n<p>The project has secured a ten-year flexibility and power purchase agreement with Germany&#8217;s Pure Energy \u2014 the first contract of this kind in the Baltics, according to the parties involved. Evecon&#8217;s CEO described the complex as a step toward Estonia&#8217;s energy security.<\/p>\n<p>The Lihula project is part of a broader build-out of Estonian storage capacity. The 100 MW\/200 MWh Hertz 2 facility came online in July, located next to the previously launched Hertz 1. A further installation rated at 192 MW\/420 MWh is under construction and expected to be commissioned by November 2027.<\/p>\n<p>The push for storage comes after the Baltic states disconnected from the Russian electricity grid in February 2025 and took over independent management of their own grid frequency.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/www.pv-magazine.com\/2026\/11\/26\/estonian-hybrid-park-energized-with-55-mw-250-mwh-battery\/\" target=\"_blank\" rel=\"noopener\">PV Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estonia has expanded its grid-balancing capacity with a new battery storage system built alongside an existing solar farm near Lihula, creating what its backers describe as the most powerful hybrid renewable complex in the Baltic region. Estonian energy company Evecon and French investment manager Mirova invested \u20ac110 million in adding a 55 MW\/250 MWh battery [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12672,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-12698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Estonia Adds Baltic&#039;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Estonia Adds Baltic&#039;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"Estonia has expanded its grid-balancing capacity with a new battery storage system built alongside an existing solar farm near Lihula, creating what its backers describe as the most powerful hybrid renewable complex in the Baltic region. Estonian energy company Evecon and French investment manager Mirova invested \u20ac110 million in adding a 55 MW\/250 MWh battery [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-27T05:57:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Estonia Adds Baltic&#8217;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal\",\"datePublished\":\"2026-11-27T05:57:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\"},\"wordCount\":237,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\",\"url\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\",\"name\":\"Estonia Adds Baltic's Largest Battery to Lihula Solar Farm in \u20ac110m Deal - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg\",\"datePublished\":\"2026-11-27T05:57:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Estonia Adds Baltic&#8217;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Estonia Adds Baltic's Largest Battery to Lihula Solar Farm in \u20ac110m Deal - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/","og_locale":"en_US","og_type":"article","og_title":"Estonia Adds Baltic's Largest Battery to Lihula Solar Farm in \u20ac110m Deal - Global 100 RE UKRAINE","og_description":"Estonia has expanded its grid-balancing capacity with a new battery storage system built alongside an existing solar farm near Lihula, creating what its backers describe as the most powerful hybrid renewable complex in the Baltic region. Estonian energy company Evecon and French investment manager Mirova invested \u20ac110 million in adding a 55 MW\/250 MWh battery [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-11-27T05:57:11+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Estonia Adds Baltic&#8217;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal","datePublished":"2026-11-27T05:57:11+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/"},"wordCount":237,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/","url":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/","name":"Estonia Adds Baltic's Largest Battery to Lihula Solar Farm in \u20ac110m Deal - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg","datePublished":"2026-11-27T05:57:11+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-do-estonskoi-soniachnoi-fermy-dobuduvaly-batareiu-na.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/estonia-adds-baltics-largest-battery-to-lihula-solar-farm-in-110m-deal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Estonia Adds Baltic&#8217;s Largest Battery to Lihula Solar Farm in \u20ac110m Deal"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=12698"}],"version-history":[{"count":0,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/12672"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=12698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=12698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=12698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}