{"id":12720,"date":"2026-11-27T16:56:35","date_gmt":"2026-11-27T14:56:35","guid":{"rendered":"https:\/\/100re.org.ua\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/"},"modified":"2026-11-27T16:56:35","modified_gmt":"2026-11-27T14:56:35","slug":"kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/","title":{"rendered":"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project"},"content":{"rendered":"<p>Kyon Energy has launched hot testing at its Dalem battery storage project, moving the 100 MW \/ 203 MWh facility from construction into the operational verification stage \u2014 though well behind schedule.<\/p>\n<p>Seventy lithium-iron-phosphate containers were installed at the site back in October 2025, but the project missed its original milestones. Two grid connections at the newly built substation were not energized until August, pushing past a Q2 2026 target, and an October deadline for commercial launch was also missed. Kyon Energy has not disclosed the reasons for the delays.<\/p>\n<p>During the hot-testing phase, the developer will verify the complex&#8217;s electrical and control systems, examine how they interact, and test grid connectivity across different operating modes. Managing Director Thomas Maubert called the start of hot testing a decisive shift from building the asset to running it, adding that all systems and components will be evaluated in stages with a strong focus on health and safety requirements.<\/p>\n<p>Dalem is the 11th project in Kyon Energy&#8217;s portfolio, following earlier sites in Arnsberg, Schob\u00fcll, and Faide. The original project schedule was drawn up in December 2025 together with battery supplier Saft. Allianz Global Investors acquired a 50% stake in the portfolio this year. Commercial operations are expected to begin in the near term.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/www.ess-news.com\/2026\/11\/24\/kyon-energy-starts-testing-203-mwh-battery-behind-schedule-in-germany\/\" target=\"_blank\" rel=\"noopener\">ESS News (pv magazine)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kyon Energy has launched hot testing at its Dalem battery storage project, moving the 100 MW \/ 203 MWh facility from construction into the operational verification stage \u2014 though well behind schedule. Seventy lithium-iron-phosphate containers were installed at the site back in October 2025, but the project missed its original milestones. Two grid connections at [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12654,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-12720","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"Kyon Energy has launched hot testing at its Dalem battery storage project, moving the 100 MW \/ 203 MWh facility from construction into the operational verification stage \u2014 though well behind schedule. Seventy lithium-iron-phosphate containers were installed at the site back in October 2025, but the project missed its original milestones. Two grid connections at [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-27T14:56:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project\",\"datePublished\":\"2026-11-27T14:56:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\"},\"wordCount\":218,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\",\"url\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\",\"name\":\"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg\",\"datePublished\":\"2026-11-27T14:56:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/","og_locale":"en_US","og_type":"article","og_title":"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project - Global 100 RE UKRAINE","og_description":"Kyon Energy has launched hot testing at its Dalem battery storage project, moving the 100 MW \/ 203 MWh facility from construction into the operational verification stage \u2014 though well behind schedule. Seventy lithium-iron-phosphate containers were installed at the site back in October 2025, but the project missed its original milestones. Two grid connections at [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-11-27T14:56:35+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project","datePublished":"2026-11-27T14:56:35+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/"},"wordCount":218,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/","url":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/","name":"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg","datePublished":"2026-11-27T14:56:35+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kyon-energy-iz-vidstavanniam-vid-hrafika-pochala.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/kyon-energy-enters-hot-testing-phase-at-delayed-dalem-storage-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Kyon Energy Enters Hot-Testing Phase at Delayed Dalem Storage Project"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=12720"}],"version-history":[{"count":0,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12720\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/12654"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=12720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=12720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=12720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}