{"id":12734,"date":"2026-11-27T17:20:06","date_gmt":"2026-11-27T15:20:06","guid":{"rendered":"https:\/\/100re.org.ua\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/"},"modified":"2026-11-27T17:20:06","modified_gmt":"2026-11-27T15:20:06","slug":"cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/","title":{"rendered":"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins"},"content":{"rendered":"<p>Cyprus has built far more solar capacity than its grid can absorb. With over 1,040 MW of installed panels against an average demand of roughly 650 MW, the island was forced to curtail nearly half its potential solar output in 2025. Over the first five months of 2026, that period-average curtailment rate worsened to 65%.<\/p>\n<p>Speaking at the 14th Cyprus Energy Symposium, Energy Minister Michael Damianos outlined a three-pillar response: expanding battery storage, pursuing market reform, and advancing a cross-border interconnector with Greece and Israel.<\/p>\n<p>The island plans to bring more than 300 MW of battery capacity online in the coming years:<\/p>\n<ul>\n<li>120 MW procured by the transmission system operator, targeted for commissioning in summer 2027<\/li>\n<li>80 MW at the Dhekelia power station, developed by the state-owned Electricity Authority of Cyprus and due by 2027<\/li>\n<li>A further 100 MW planned at the Moni station<\/li>\n<\/ul>\n<p>The storage market is still in its infancy. The first utility-scale battery facility \u2014 a 5 MWh project \u2014 came online only in August. Several other systems installed earlier this year remain unconnected to the grid.<\/p>\n<p>As the only EU member with no electrical link to the continental network, Cyprus has named the Great Sea Interconnector a strategic priority. The planned subsea cable would tie the island into the European grid via Greece and Israel, opening a route to export surplus generation rather than simply switching it off.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/www.ess-news.com\/2026\/11\/24\/cyprus-plans-to-deploy-over-300-mw-of-battery-storage\/\" target=\"_blank\" rel=\"noopener\">ESS News (pv magazine)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cyprus has built far more solar capacity than its grid can absorb. With over 1,040 MW of installed panels against an average demand of roughly 650 MW, the island was forced to curtail nearly half its potential solar output in 2025. Over the first five months of 2026, that period-average curtailment rate worsened to 65%. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12636,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-12734","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"Cyprus has built far more solar capacity than its grid can absorb. With over 1,040 MW of installed panels against an average demand of roughly 650 MW, the island was forced to curtail nearly half its potential solar output in 2025. Over the first five months of 2026, that period-average curtailment rate worsened to 65%. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-27T15:20:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins\",\"datePublished\":\"2026-11-27T15:20:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\"},\"wordCount\":233,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\",\"url\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\",\"name\":\"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg\",\"datePublished\":\"2026-11-27T15:20:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/","og_locale":"en_US","og_type":"article","og_title":"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins - Global 100 RE UKRAINE","og_description":"Cyprus has built far more solar capacity than its grid can absorb. With over 1,040 MW of installed panels against an average demand of roughly 650 MW, the island was forced to curtail nearly half its potential solar output in 2025. Over the first five months of 2026, that period-average curtailment rate worsened to 65%. [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-11-27T15:20:06+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins","datePublished":"2026-11-27T15:20:06+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/"},"wordCount":233,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/","url":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/","name":"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg","datePublished":"2026-11-27T15:20:06+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-kipr-planuie-rozhornuty-ponad-300-mvt-nakopychuvachiv.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/cyprus-wastes-two-thirds-of-its-solar-as-battery-race-begins\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Cyprus Wastes Two-Thirds of Its Solar as Battery Race Begins"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=12734"}],"version-history":[{"count":0,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12734\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/12636"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=12734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=12734"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=12734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}