{"id":12749,"date":"2026-11-27T17:45:49","date_gmt":"2026-11-27T15:45:49","guid":{"rendered":"https:\/\/100re.org.ua\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/"},"modified":"2026-11-27T17:45:49","modified_gmt":"2026-11-27T15:45:49","slug":"romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/","title":{"rendered":"Romania&#8217;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output"},"content":{"rendered":"<p>A 99.2 MW wind farm in Romania&#8217;s Gala\u021bi county has entered commercial operation, adding 16 Vestas V162-6.2 MW turbines to the country&#8217;s clean energy grid. The Green Breeze project reached commercial operation in September 2026, roughly two years after construction began, and is expected to generate 312 GWh annually \u2014 enough to supply around 51,000 households.<\/p>\n<p>The electricity will flow to Apple under a long-term power purchase agreement. For Nala Renewables, the London-based developer owned by IFM Investors funds and active across Europe and Chile, Green Breeze is both its largest project carried from development through to operation and its first in Romania.<\/p>\n<p>OX2 handled development and turnkey construction and will remain responsible for technical and commercial management going forward. Kompact Grid served as co-developer, while Natural Power filled the owner&#8217;s engineer role. Vestas has been contracted for long-term turbine servicing.<\/p>\n<p>Financing came from five lenders: Erste Group Bank and Banca Comercial\u0103 Rom\u00e2n\u0103 led the initial debt package, with Nord\/LB, ING, and Siemens Bank providing additional funding.<\/p>\n<p>The farm is projected to avoid approximately 150,000 tonnes of CO\u2082 emissions each year. R\u00e9mi V\u00e9rot, interim chief executive of Nala Renewables, said Green Breeze would strengthen Romania&#8217;s energy security and advance its shift toward cleaner power.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/www.renews.biz\/onshore-wind\/nala-inaugurates-99mw-romanian-wind-farm\/\" target=\"_blank\" rel=\"noopener\">reNews<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 99.2 MW wind farm in Romania&#8217;s Gala\u021bi county has entered commercial operation, adding 16 Vestas V162-6.2 MW turbines to the country&#8217;s clean energy grid. The Green Breeze project reached commercial operation in September 2026, roughly two years after construction began, and is expected to generate 312 GWh annually \u2014 enough to supply around 51,000 [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12581,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-12749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Romania&#039;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Romania&#039;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"A 99.2 MW wind farm in Romania&#8217;s Gala\u021bi county has entered commercial operation, adding 16 Vestas V162-6.2 MW turbines to the country&#8217;s clean energy grid. The Green Breeze project reached commercial operation in September 2026, roughly two years after construction began, and is expected to generate 312 GWh annually \u2014 enough to supply around 51,000 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-27T15:45:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Romania&#8217;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output\",\"datePublished\":\"2026-11-27T15:45:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\"},\"wordCount\":219,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\",\"url\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\",\"name\":\"Romania's Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg\",\"datePublished\":\"2026-11-27T15:45:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Romania&#8217;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Romania's Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/","og_locale":"en_US","og_type":"article","og_title":"Romania's Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output - Global 100 RE UKRAINE","og_description":"A 99.2 MW wind farm in Romania&#8217;s Gala\u021bi county has entered commercial operation, adding 16 Vestas V162-6.2 MW turbines to the country&#8217;s clean energy grid. The Green Breeze project reached commercial operation in September 2026, roughly two years after construction began, and is expected to generate 312 GWh annually \u2014 enough to supply around 51,000 [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-11-27T15:45:49+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/100re.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Romania&#8217;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output","datePublished":"2026-11-27T15:45:49+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/"},"wordCount":219,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/","url":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/","name":"Romania's Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg","datePublished":"2026-11-27T15:45:49+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/11\/cover-apple-kupuvatyme-elektroenerhiiu-rumunskoho-vitroparku-green.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/romanias-green-breeze-wind-farm-powers-up-with-apple-deal-and-312-gwh\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Romania&#8217;s Green Breeze Wind Farm Powers Up with Apple Deal and 312 GWh Annual Output"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=12749"}],"version-history":[{"count":0,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/12749\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/12581"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=12749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=12749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=12749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}