{"id":4689,"date":"2025-06-10T20:09:33","date_gmt":"2025-06-10T17:09:33","guid":{"rendered":"https:\/\/100re.org.ua\/?p=4689"},"modified":"2025-06-10T20:13:15","modified_gmt":"2025-06-10T17:13:15","slug":"a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/","title":{"rendered":"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv"},"content":{"rendered":"<p>A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv As part of the municipal project \u201cSolar Chortkiv\u201d, the city has received a new 50\u202fkW solar power plant that will supply electricity to the maternity and infectious diseases departments of the Chortkiv Central City Hospital.<\/p>\n<p>The installation became possible thanks to the project\u2019s victory in the \u201cSun for Ukraine\u201d competition, organized by Greenpeace Ukraine in cooperation with the BIOHAUS-Stiftung foundation.<\/p>\n<p>This is already the third solar power system installed for the needs of the city hospital:<\/p>\n<p>a 21.6\u202fkW grid-connected system for the inpatient building,<\/p>\n<p>a hybrid system (50\u202fkW + 40\u202fkWh battery storage) for the outpatient clinic,<\/p>\n<p>and now a new 50\u202fkW plant to support critical infrastructure, specifically the maternity and infectious diseases units.<\/p>\n<p>The goal of the project is to strengthen the hospital\u2019s energy resilience, reduce electricity costs, and showcase effective local solutions in the transition to renewable energy.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4687\" src=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg\" alt=\"\u0427\u043e\u0440\u0442\u043a\u043e\u0432\u0456\" width=\"1040\" height=\"584\" srcset=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg 1040w, https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7-300x168.jpg 300w, https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7-1024x575.jpg 1024w, https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7-768x431.jpg 768w\" sizes=\"auto, (max-width: 1040px) 100vw, 1040px\" \/><\/p>\n<p><strong>Project Background<\/strong><\/p>\n<p>The \u201cSolar Chortkiv\u201d initiative is led by the Chortkiv City Council to increase the energy independence and sustainability of municipal institutions. Implementing solar power plants reduces pressure on the local budget and helps ensure continuous operation of medical facilities in case of power outages.<\/p>\n<p>The new solar installation for the hospital\u2019s critical departments is an important step in this direction. Previous hybrid systems in other hospital buildings have already demonstrated the potential of combining renewable generation with battery storage.x<\/p>\n<p>Source: <a href=\"https:\/\/www.chortkivmr.gov.ua\/2025\/06\/10\/proyekt-sonyachnyj-chortkiv-u-diyi-otrymaly-shhe-odnu-sonyachnu-elektrostantsiyu-dlya-likarni\/?utm_source=chatgpt.com\">Official website of Chortkiv City Council.<\/a><\/p>\n<p><strong data-start=\"1762\" data-end=\"1779\">Related post:<\/strong> <a href=\"https:\/\/100re.org.ua\/?s=\u0447\u043e\u0440\u0442\u043a\u0456\u0432\">Previous update about the solar installation for the outpatient clinic<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv As part of the municipal project \u201cSolar Chortkiv\u201d, the city has received a new 50\u202fkW solar power plant that will supply electricity to the maternity and infectious diseases departments of the Chortkiv Central City Hospital. The installation became possible thanks to the project\u2019s victory [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4687,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50,51],"tags":[],"class_list":["post-4689","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-newsroom"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv - Global 100 RE UKRAINE<\/title>\n<meta name=\"description\" content=\"A new 50\u202fkW solar power plant for hospital in Chortkiv will support critical departments. This is the third solar system under the Solar Chortkiv project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"A new 50\u202fkW solar power plant for hospital in Chortkiv will support critical departments. This is the third solar system under the Solar Chortkiv project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-10T17:09:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-10T17:13:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1040\" \/>\n\t<meta property=\"og:image:height\" content=\"584\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv\",\"datePublished\":\"2025-06-10T17:09:33+00:00\",\"dateModified\":\"2025-06-10T17:13:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\"},\"wordCount\":264,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg\",\"articleSection\":[\"Green Energy News\",\"Newsroom\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\",\"url\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\",\"name\":\"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg\",\"datePublished\":\"2025-06-10T17:09:33+00:00\",\"dateModified\":\"2025-06-10T17:13:15+00:00\",\"description\":\"A new 50\u202fkW solar power plant for hospital in Chortkiv will support critical departments. This is the third solar system under the Solar Chortkiv project.\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg\",\"width\":1040,\"height\":584,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv - Global 100 RE UKRAINE","description":"A new 50\u202fkW solar power plant for hospital in Chortkiv will support critical departments. This is the third solar system under the Solar Chortkiv project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/","og_locale":"en_US","og_type":"article","og_title":"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv - Global 100 RE UKRAINE","og_description":"A new 50\u202fkW solar power plant for hospital in Chortkiv will support critical departments. This is the third solar system under the Solar Chortkiv project.","og_url":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2025-06-10T17:09:33+00:00","article_modified_time":"2025-06-10T17:13:15+00:00","og_image":[{"width":1040,"height":584,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv","datePublished":"2025-06-10T17:09:33+00:00","dateModified":"2025-06-10T17:13:15+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/"},"wordCount":264,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg","articleSection":["Green Energy News","Newsroom"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/","url":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/","name":"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg","datePublished":"2025-06-10T17:09:33+00:00","dateModified":"2025-06-10T17:13:15+00:00","description":"A new 50\u202fkW solar power plant for hospital in Chortkiv will support critical departments. This is the third solar system under the Solar Chortkiv project.","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2025\/06\/b60b5d55744d76f7.jpg","width":1040,"height":584,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/a-new-50-kw-solar-power-plant-installed-for-hospital-in-chortkiv\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"A New 50\u202fkW Solar Power Plant Installed for Hospital in Chortkiv"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/4689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=4689"}],"version-history":[{"count":1,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/4689\/revisions"}],"predecessor-version":[{"id":4690,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/4689\/revisions\/4690"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/4687"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=4689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=4689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=4689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}