{"id":6627,"date":"2026-01-20T11:57:54","date_gmt":"2026-01-20T09:57:54","guid":{"rendered":"https:\/\/100re.org.ua\/?p=6627"},"modified":"2026-01-21T11:59:50","modified_gmt":"2026-01-21T09:59:50","slug":"biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/","title":{"rendered":"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating"},"content":{"rendered":"<p data-start=\"148\" data-end=\"554\">n December 2025, the municipal energy company <strong data-start=\"195\" data-end=\"236\"><span class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"><span class=\"whitespace-normal\">G\u00f6teborg Energi AB<\/span><\/span><\/strong> began commissioning a new biomass-fired steam boiler at the <strong data-start=\"297\" data-end=\"338\"><span class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"><span class=\"whitespace-normal\">Rya CHP plant<\/span><\/span><\/strong>, a key hub in Gothenburg\u2019s district heating system.<br data-start=\"390\" data-end=\"393\" \/>The project marks a decisive step away from fossil natural gas, significantly reducing carbon emissions while strengthening the city\u2019s long-term energy security.<\/p>\n<h3 data-start=\"556\" data-end=\"582\">Key Project Parameters<\/h3>\n<p data-start=\"583\" data-end=\"890\">The new biomass unit delivers <strong data-start=\"613\" data-end=\"643\">156 MW of thermal capacity<\/strong> and <strong data-start=\"648\" data-end=\"678\">39 MW of electrical output<\/strong>, covering a substantial share of Gothenburg\u2019s district heating demand.<br data-start=\"749\" data-end=\"752\" \/>Fuel is sourced from <strong data-start=\"773\" data-end=\"831\">locally available processed wood and forestry residues<\/strong>, reinforcing a circular, regionally anchored energy model.<\/p>\n<p data-start=\"892\" data-end=\"1220\">According to the company, replacing fossil gas with biomass will cut <strong data-start=\"961\" data-end=\"1033\">fossil CO\u2082 emissions by approximately 30,000\u2013150,000 tonnes per year<\/strong>, depending on operating conditions. With a total investment of around <strong data-start=\"1104\" data-end=\"1123\">EUR 231 million<\/strong>, the project represents <strong data-start=\"1148\" data-end=\"1219\">G\u00f6teborg Energi\u2019s largest single climate-related investment to date<\/strong>.<\/p>\n<h3 data-start=\"1222\" data-end=\"1264\">Proven Technology and Fuel Flexibility<\/h3>\n<p data-start=\"1265\" data-end=\"1595\">The boiler is based on <strong data-start=\"1288\" data-end=\"1320\">bubbling fluidised bed (BFB)<\/strong> technology, which enables efficient combustion of a wide range of biomass fuels with varying moisture content and particle size.<br data-start=\"1449\" data-end=\"1452\" \/>This flexibility enhances operational reliability and allows the plant to adapt to changing fuel availability without compromising performance.<\/p>\n<h3 data-start=\"1597\" data-end=\"1633\">100% Renewable Heat for the City<\/h3>\n<p data-start=\"1634\" data-end=\"2050\">By integrating the new biomass boiler into the existing Rya CHP infrastructure, G\u00f6teborg Energi can\u2014under normal operating conditions\u2014supply <strong data-start=\"1775\" data-end=\"1814\">100% renewable and recovered energy<\/strong> to Gothenburg\u2019s district heating network.<br data-start=\"1856\" data-end=\"1859\" \/>Company leadership emphasises that the transition not only cuts emissions but also <strong data-start=\"1942\" data-end=\"1993\">reduces exposure to volatile fossil gas markets<\/strong>, improving both climate performance and supply security.<\/p>\n<h3 data-start=\"2052\" data-end=\"2102\">Economic Stability and Predictable Heat Prices<\/h3>\n<p data-start=\"2103\" data-end=\"2392\">Moving away from fossil gas for residential and commercial heating also helps <strong data-start=\"2181\" data-end=\"2218\">stabilise district heating prices<\/strong>. Biomass-based generation reduces sensitivity to international gas price fluctuations, providing customers with more predictable and resilient heat costs over the long term.<\/p>\n<h3 data-start=\"2394\" data-end=\"2434\">A Pillar of Energy System Resilience<\/h3>\n<p data-start=\"2435\" data-end=\"2847\">Although fossil gas is no longer used as a primary fuel for heat production, the <strong data-start=\"2516\" data-end=\"2573\">existing gas turbines at the Rya site remain in place<\/strong>. They can be rapidly deployed to generate electricity during periods of power system stress or shortages.<br data-start=\"2679\" data-end=\"2682\" \/>This dual approach\u2014deep decarbonisation combined with retained backup capacity\u2014positions the Rya CHP plant as a <strong data-start=\"2794\" data-end=\"2846\">strategic asset for Gothenburg\u2019s energy security<\/strong>.<\/p>\n<h3 data-start=\"2849\" data-end=\"2874\">Why This Case Matters<\/h3>\n<p data-start=\"2875\" data-end=\"3237\">The Gothenburg project demonstrates how large cities can <strong data-start=\"2932\" data-end=\"2996\">replace fossil gas in district heating with biomass at scale<\/strong>, without sacrificing reliability or affordability.<br data-start=\"3047\" data-end=\"3050\" \/>It offers a concrete, bankable example for municipalities across Europe and beyond that are seeking to decarbonise heat supply while reinforcing energy independence and system resilience.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>n December 2025, the municipal energy company G\u00f6teborg Energi AB began commissioning a new biomass-fired steam boiler at the Rya CHP plant, a key hub in Gothenburg\u2019s district heating system.The project marks a decisive step away from fossil natural gas, significantly reducing carbon emissions while strengthening the city\u2019s long-term energy security. Key Project Parameters The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6625,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-6627","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"n December 2025, the municipal energy company G\u00f6teborg Energi AB began commissioning a new biomass-fired steam boiler at the Rya CHP plant, a key hub in Gothenburg\u2019s district heating system.The project marks a decisive step away from fossil natural gas, significantly reducing carbon emissions while strengthening the city\u2019s long-term energy security. Key Project Parameters The [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-20T09:57:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-21T09:59:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"770\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"vseo_admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\"},\"author\":{\"name\":\"vseo_admin\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/019f3de3ad4032df9a59cc0e3241d200\"},\"headline\":\"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating\",\"datePublished\":\"2026-01-20T09:57:54+00:00\",\"dateModified\":\"2026-01-21T09:59:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\"},\"wordCount\":437,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\",\"url\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\",\"name\":\"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp\",\"datePublished\":\"2026-01-20T09:57:54+00:00\",\"dateModified\":\"2026-01-21T09:59:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp\",\"width\":770,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/019f3de3ad4032df9a59cc0e3241d200\",\"name\":\"vseo_admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5b7349d2c7d49e7c7ad9f12fda1dd99544ba0eac03022c27aba053c137f8f74d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5b7349d2c7d49e7c7ad9f12fda1dd99544ba0eac03022c27aba053c137f8f74d?s=96&d=mm&r=g\",\"caption\":\"vseo_admin\"},\"sameAs\":[\"https:\/\/100re.org.ua\"],\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/","og_locale":"en_US","og_type":"article","og_title":"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating - Global 100 RE UKRAINE","og_description":"n December 2025, the municipal energy company G\u00f6teborg Energi AB began commissioning a new biomass-fired steam boiler at the Rya CHP plant, a key hub in Gothenburg\u2019s district heating system.The project marks a decisive step away from fossil natural gas, significantly reducing carbon emissions while strengthening the city\u2019s long-term energy security. Key Project Parameters The [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-01-20T09:57:54+00:00","article_modified_time":"2026-01-21T09:59:50+00:00","og_image":[{"width":770,"height":500,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp","type":"image\/webp"}],"author":"vseo_admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/"},"author":{"name":"vseo_admin","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/019f3de3ad4032df9a59cc0e3241d200"},"headline":"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating","datePublished":"2026-01-20T09:57:54+00:00","dateModified":"2026-01-21T09:59:50+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/"},"wordCount":437,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/","url":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/","name":"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp","datePublished":"2026-01-20T09:57:54+00:00","dateModified":"2026-01-21T09:59:50+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/01\/goteborgenergi.webp","width":770,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/biomass-boiler-replacing-fossil-gas-how-gothenburg-is-moving-to-100-renewable-district-heating\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Biomass Boiler Replacing Fossil Gas: How Gothenburg Is Moving to 100% Renewable District Heating"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/019f3de3ad4032df9a59cc0e3241d200","name":"vseo_admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5b7349d2c7d49e7c7ad9f12fda1dd99544ba0eac03022c27aba053c137f8f74d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5b7349d2c7d49e7c7ad9f12fda1dd99544ba0eac03022c27aba053c137f8f74d?s=96&d=mm&r=g","caption":"vseo_admin"},"sameAs":["https:\/\/100re.org.ua"],"url":"https:\/\/100re.org.ua\/en\/author\/vseo_admin\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/6627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=6627"}],"version-history":[{"count":1,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/6627\/revisions"}],"predecessor-version":[{"id":6628,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/6627\/revisions\/6628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/6625"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=6627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=6627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=6627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}