{"id":9395,"date":"2026-09-24T20:16:12","date_gmt":"2026-09-24T17:16:12","guid":{"rendered":"https:\/\/100re.org.ua\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/"},"modified":"2026-09-24T21:25:53","modified_gmt":"2026-09-24T18:25:53","slug":"spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and","status":"publish","type":"post","link":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/","title":{"rendered":"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage"},"content":{"rendered":"<p>Spain&#8217;s Ministry of Ecological Transition (MITECO) has launched a two-week public consultation on how to distribute up to 11 gigawatts of grid capacity earmarked for renewable energy and storage projects in just transition zones.<\/p>\n<p>The proposed framework splits the quota between two tracks. Fifteen designated nodes \u2014 spread across northern and southern Spanish provinces \u2014 would operate under a simplified first-come-first-served procedure, with applicants required to meet socio-economic commitments and environmental conditions. Two nodes, Guardo and Velilla, would instead enter a competitive tender scored on the same criteria; both locations have attracted particular interest from pumped hydro developers.<\/p>\n<p>The capacity round arrives alongside a dense package of parallel support measures. Spain&#8217;s RENOINN 2 programme has already committed \u20ac433 million to 524 hybrid generation-and-storage facilities, covering a combined 1.22 GW of solar and 2.3 GWh of storage capacity. In July 2026, the RENOVAL 2 scheme channelled more than \u20ac160 million to 40 clean industry projects, while a separate \u20ac355 million initiative is backing domestic manufacturing of solar panels, batteries, and storage systems. The government has also announced a national capacity market that would compensate generation and storage assets for controllability and grid flexibility.<\/p>\n<figure class=\"wp-block-image size-large\" style=\"margin:1.5em 0 2.4em\"><img decoding=\"async\" src=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/chart-1-en-2026-09-24.png\" alt=\"RENOINN 2 \u2014 524 projects, including 1.22 GW of solar and 2.3 GWh of storage. Data: MITECO\" style=\"max-width:100%;height:auto\" \/><figcaption style=\"display:block;font-size:13px;font-weight:400;font-style:italic;color:#8a8f86;text-align:center;line-height:1.45;margin-top:8px\">RENOINN 2 \u2014 524 projects, including 1.22 GW of solar and 2.3 GWh of storage. Data: MITECO<\/figcaption><\/figure>\n<p>An August proposal adds a further condition: new data centres drawing more than one megawatt would be required to pair each megawatt of demand with an equivalent amount of newly built renewable capacity.<\/p>\n<p>MITECO&#8217;s consultation closes on 8 October, after which authorities will move to draft the formal regulatory framework.<\/p>\n<p style=\"margin-top:1.5em;font-size:.9em;color:#555\">Source: <a href=\"https:\/\/www.pv-tech.org\/spain-launches-11gw-renewable-and-storage-grid-capacity-allocation-process\/\" target=\"_blank\" rel=\"noopener\">PV-Tech<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Spain&#8217;s Ministry of Ecological Transition (MITECO) has launched a two-week public consultation on how to distribute up to 11 gigawatts of grid capacity earmarked for renewable energy and storage projects in just transition zones. The proposed framework splits the quota between two tracks. Fifteen designated nodes \u2014 spread across northern and southern Spanish provinces \u2014 [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":9361,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[50],"tags":[],"class_list":["post-9395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage - Global 100 RE UKRAINE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage - Global 100 RE UKRAINE\" \/>\n<meta property=\"og:description\" content=\"Spain&#8217;s Ministry of Ecological Transition (MITECO) has launched a two-week public consultation on how to distribute up to 11 gigawatts of grid capacity earmarked for renewable energy and storage projects in just transition zones. The proposed framework splits the quota between two tracks. Fifteen designated nodes \u2014 spread across northern and southern Spanish provinces \u2014 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\" \/>\n<meta property=\"og:site_name\" content=\"Global 100 RE UKRAINE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/100REUA\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-24T17:16:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-24T18:25:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vseo_editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vseo_editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\"},\"author\":{\"name\":\"vseo_editor\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\"},\"headline\":\"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage\",\"datePublished\":\"2026-09-24T17:16:12+00:00\",\"dateModified\":\"2026-09-24T18:25:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\"},\"wordCount\":253,\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg\",\"articleSection\":[\"Green Energy News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\",\"url\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\",\"name\":\"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage - Global 100 RE UKRAINE\",\"isPartOf\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg\",\"datePublished\":\"2026-09-24T17:16:12+00:00\",\"dateModified\":\"2026-09-24T18:25:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\/\/100re.org.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/100re.org.ua\/en\/#website\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"name\":\"Global 100 RE UKRAINE\",\"description\":\"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456\",\"publisher\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\"},\"alternateName\":\"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/100re.org.ua\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/100re.org.ua\/en\/#organization\",\"name\":\"Global 100 RE UKRAINE\",\"url\":\"https:\/\/100re.org.ua\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"contentUrl\":\"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg\",\"width\":696,\"height\":630,\"caption\":\"Global 100 RE UKRAINE\"},\"image\":{\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/100REUA\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0\",\"name\":\"vseo_editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g\",\"caption\":\"vseo_editor\"},\"url\":\"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage - Global 100 RE UKRAINE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/","og_locale":"en_US","og_type":"article","og_title":"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage - Global 100 RE UKRAINE","og_description":"Spain&#8217;s Ministry of Ecological Transition (MITECO) has launched a two-week public consultation on how to distribute up to 11 gigawatts of grid capacity earmarked for renewable energy and storage projects in just transition zones. The proposed framework splits the quota between two tracks. Fifteen designated nodes \u2014 spread across northern and southern Spanish provinces \u2014 [&hellip;]","og_url":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/","og_site_name":"Global 100 RE UKRAINE","article_publisher":"https:\/\/www.facebook.com\/100REUA\/","article_published_time":"2026-09-24T17:16:12+00:00","article_modified_time":"2026-09-24T18:25:53+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg","type":"image\/jpeg"}],"author":"vseo_editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vseo_editor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#article","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/"},"author":{"name":"vseo_editor","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0"},"headline":"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage","datePublished":"2026-09-24T17:16:12+00:00","dateModified":"2026-09-24T18:25:53+00:00","mainEntityOfPage":{"@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/"},"wordCount":253,"publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"image":{"@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg","articleSection":["Green Energy News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/","url":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/","name":"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage - Global 100 RE UKRAINE","isPartOf":{"@id":"https:\/\/100re.org.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage"},"image":{"@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage"},"thumbnailUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg","datePublished":"2026-09-24T17:16:12+00:00","dateModified":"2026-09-24T18:25:53+00:00","breadcrumb":{"@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#primaryimage","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2026\/09\/cover-ispaniia-zapustyla-poperedni-konsultatsii-shchodo-protsedur.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/100re.org.ua\/en\/spain-opens-consultations-on-11-gw-grid-allocation-for-renewables-and\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/100re.org.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Spain Opens Consultations on 11 GW Grid Allocation for Renewables and Storage"}]},{"@type":"WebSite","@id":"https:\/\/100re.org.ua\/en\/#website","url":"https:\/\/100re.org.ua\/en\/","name":"Global 100 RE UKRAINE","description":"\u0421\u0430\u0439\u0442 \u043f\u0440\u043e \u0412\u0414\u0415 \u0456 \u0437\u0435\u043b\u0435\u043d\u0443 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u044e \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456","publisher":{"@id":"https:\/\/100re.org.ua\/en\/#organization"},"alternateName":"\u0413\u043b\u043e\u0431\u0430\u043b 100 \u0420\u0415 \u0423\u041a\u0420\u0410\u0407\u041d\u0410","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/100re.org.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/100re.org.ua\/en\/#organization","name":"Global 100 RE UKRAINE","url":"https:\/\/100re.org.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","contentUrl":"https:\/\/100re.org.ua\/wp-content\/uploads\/2023\/09\/logo-22.jpg","width":696,"height":630,"caption":"Global 100 RE UKRAINE"},"image":{"@id":"https:\/\/100re.org.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/100REUA\/"]},{"@type":"Person","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/419491d064d1b36d9d80b518ed4f19c0","name":"vseo_editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/100re.org.ua\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65edb16c143eeedd2f2f432cffa20bdfc2b046a7781fda47030d19d176591d6f?s=96&d=mm&r=g","caption":"vseo_editor"},"url":"https:\/\/100re.org.ua\/en\/author\/vseo_editor\/"}]}},"_links":{"self":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/9395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/comments?post=9395"}],"version-history":[{"count":1,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/9395\/revisions"}],"predecessor-version":[{"id":9415,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/posts\/9395\/revisions\/9415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media\/9361"}],"wp:attachment":[{"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/media?parent=9395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/categories?post=9395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/100re.org.ua\/en\/wp-json\/wp\/v2\/tags?post=9395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}